THE EURO POLYMERS ETHOS
Quote from Managing Director, Steve Horn:
"I started in the roofing sector in 1985 and have worked in the industry all my career. Over the years I have seen many changes in both product & quality of installation. Back in the day, the most basic of product could be installed to the highest standard due to the city & guilds courses, which at the time were the industry standard.
Contractors would be training for up to 6 years to ensure the very best of application. Today our industry faces huge challenges, with inferior products designed for Mediterranean climates which aren’t suitable for the UK’s every changing seasons.
These systems can be applied by a qualified roofing contractor after just a one day training course.
Our ethos is to wind back the clock somewhat, to deliver a quality product, installed by technician level applicators for a fair price.
This unique approach to roofing has been welcomed by our client base."
A HIGHLY QUALIFIED TEAM
Our team can boast the following qualifications:
What Our Clients Say
"I use them on almost all of my projects as they just get the job done without cribbing. My clients love the fact that they make it and install it, and whilst I never condone using a system because of the guarantee offered their unabridged warranty is a huge benefit to my customer as it means something and is insurance backed."
Dave Rose
MNA Group, Managing Director
"I’ve now used Europolymers as my “go to” specialist for all things roofing and love working with the whole TEAM because they simply take all the stress out of the job and always do exactly what they say they will, when they said they’ll do it. Others should take a leaf from their book."
Paul Swinney
C Eng MIEE
"Euro Polymers price was very competitive and, as importantly, they kept to their quotation in spite of having to do extra work to improve the roof in various parts which couldn't be identified before the start of the project. They did say that they would look after any unforeseen problems at their cost, and they reliably did. Health and Safety was carried out to the letter during the works as far as I could see and the project started and finished on time."
Paul Wrightman
Owner/Managing Director - Red Kangaroo Ltd.
"Within 3 days of contacting Euro Polymers we had a full site inspection, detailed report and quotation outlining our various options. To give us time to work through the information without the worry of water ingress some minor repairs were completed there and then which was a huge relief. On site Euro Polymers liaised with all of our tenants across the Estate and provided regular progress reports, allowing us to relax through the process knowing they had it in hand."